Thursday, February 28, 2008

Basement Construction (Stained Concrete)

The process for staining the concrete took about 4 work days and the odor generated when they sealed it drove us out of the house (even me after an entire night at work with only 3 hours sleep). We're pleased, however, with the finished product!

Anna & Meg decided to pose for a few pictures this time!

The walls are still a little wet from the touch-up work they did today.

As you can see, the stain adheres differently to certain sections of the concrete...it gives it a unique look!

Most of the patch work in the bathroom will be covered with the toilet and the vanity, however, you may see a little bit of the darker concrete.

Wednesday, February 20, 2008

Basement Construction (Lighting & Electrical)

And then there was light...Finally!

Craftroom...

Bathroom (With patched concrete)...

Bathroom hallway with sconce light...

View from bedroom double doors...

Basement Construction (Painting)

They painted the basement today so hopefully tomorrow they'll hang the light fixtures and start some of the trim! You may not be able to see much of a difference from when they textured, but you sure can smell the difference!

Hallway to finished theater room.


View from bathroom hallway looking at spare bedroom.

Looking at the closet (unfinished storage to the left).

You've seen this view before...I think you get the idea!

Monday, February 18, 2008

Basement Construction (Wall texture)

Well, they surprised us on Saturday afternoon when they showed up to texture the walls. Hopefully on Monday they'll paint...It's starting to really come together!

View from the closet looking at the hallway leading to the finished theater room


This is the hallway leading to the bathroom. There will be a sconce light on the angle wall.

Standing with the double doors leading to the bedroom behind me looking at the the unfinished area to the right, the hallway to the bathroom in the center and the hallway to the finished theater room to the left.

Standing in the finished part of the basement looking back the hallway to the new section. The stairs are to the right and the hot water heater/furnace area with have louvered folding doors to match the rest of the trim in the house!

Thursday, February 14, 2008

Basement Construction (Drywall & Mud)

After only 9 working days, they just finished the first coat of mud on the drywall. Hopefully by working day 11 you'll see tecture on the walls and day 12 should start with the painting!

View of hallway leading to finished theater room.

Looking into the craftroom with the closet at the far end as you come out of the hallway from the finished theater room.

View from the closet through the craftroom into the hallway leading to the finished theater room.

Hallway leading to the bathroom.

The Bathroom.

Looking from the unfinished storage into the craftroom and the hallway leading to the finished theater room.

Basement Construction (Drywall)

Full shower with drywall in the bathroom.


Looking into the unfinished storage with the closet to the right.

Standing in the craftroom with hallway to theater room to the left, hallway to the bathroom in the center and the storage area to the right.

Standing in the closet looking into the craftroom and the hallway to the theater room.

Hallway to the theater room with storage under the stairs to the left.

Basement Construction (Plumbing & Shower)

The plumber had a little work to do! Vanity on the left, toilet in the center and shower to the right.

Shower pan without sides and shower plumbing. Should be a nice sized shower!

Basement Construction (Insulation)

Looking from basement bedroom with bathroom hallway to the left and unfinished storage to the right.



Hallway to finished theater room to the left and hallway to bathroom in the center of the picture.

Standing in the closet looking at hallway to the finished theater room.

Basement Construction (Electrical & Plumbing)

Looking back from the basement bedroom into the hallway that leads to the bathroom.


Same view but also shows the hallway to the left (leading to theater room) and unfinished storage to the right.

They had to move the rough-in for the plumbing. The vanity will be on the left, toilet moved to the right and shower to the far right.

Basement Construction (Framing)

We started construction on our basement to finish the bathroom and craftroom room. Here are a few photos that step you through the process!

Looking into the future hallway that will lead to the already finished section and theater room.

Looking from the hallway mentioned above. Future closet straight ahead and to the left will be unfinished storage.

Anna is walking back the future hallway to the new full bathroom.

Friday, February 08, 2008

Last Day!

We spent the last day at Animal Kingdom. We saw some shows, rode some rides, then we were off to the airport to catch our flight!



Finally, home at last and the girls enjoyed sleeping in their own beds!

Thursday, February 07, 2008

The day after

The day after the marathon of course! Todd wasn't too sore and he was able to walk around and meet some characters.

Todd, the Mouse and his medal!




The girls enjoyed meeting Mickey!



A group shot of the 8 of us!




Meg meets her favorite princess.



Anna meets her old friend , Cinderella!





The girls look beautiful with Belle.





A popcorn snack before the evening parade!